PROGRAMME Environment and Climate Action Sector Operational Programme
PRIORITY AREA Water (Infrastructure Activities)
BENEFICIARY(IES) Rize Municipality
PLACE Rize
ABOUT THE PROJECT Overall Objective of the project is:

To contribute to the improvement of public health by addressing the gap in legislative compliance, and to enhance the water quality of the Black Sea, thereby supporting Türkiye’s environmental protection efforts and alignment with the EU wastewater sector directives within the accession process

Specific Objectives of the Project:

  • Construction of wastewater treatment plant and wastewater network
  • Improving the water quality of Black Sea via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health
  • Overcoming the operational problems in the sewerage system through construction of wastewater network
  • Meeting the wastewater needs of the region until 2047
COMPONENTS AND BUDGETS OF THE PROJECT

CONTRACT 1

NAME OF THE CONTRACT Rize Integrated Water Project Technical Assistance and Consultancy Works
BUDGET OF THE CONTRACT 1,499,525.00 Euros
START DATE 01/02/2021
END DATE Ongoing.

CONTRACT 2

NAME OF THE CONTRACT Rize Wastewater Treatment Plant Construction Works Contract
BUDGET OF THE CONTRACT 13,856,641.05 Euros
START DATE 30/04/2021
END DATE Ongoing
PHYSICAL PROGRESS 50%

CONTRACT 3

NAME OF THE CONTRACT Rize Wastewater Collector System Construction Works Contract
BUDGET OF THE CONTRACT 4,553,000.00 Euros
START DATE 03/2021
END DATE Terminated.
PHYSICAL PROGRESS 34%