| NAME OF THE PROGRAMME | Environment Operational Programme (2007-2013) |
| START DATE | 10/01/2013 |
| END DATE | 17/11/2017 |
| BENEFICIARY(IES) | Lot 1: Trabzon, Elbistan, Bozüyük Municipalities
Lot 2: Giresun, Bandırma, Çankırı, Niksar, Rize, Kırşehir and Kastamonu Municipalities Lot 3: Yüksekova, Bismil, Iğdır, Şırnak, Viranşehir (financed under FRIT) Municipalities |
| BUDGET OF THE PROJECT | 10,525,589.00 Euros |
| ABOUT THE PROJECT | Within the scope of the project, comprehensive work was carried out in the field of environmental infrastructure and wastewater management. Field visits and surveys were conducted, the necessary geotechnical and topographic studies were performed, and maps were prepared. Wastewater characterisation studies based on quality and quantity surveys were carried out, and the current situation was analysed in detail.
In accordance with FIDIC/PRAG requirements, all necessary supporting documents for the technical assistance, construction and supply components (feasibility studies, master plans, designs, drawings, etc.) were prepared, and IPA Application Packages containing complete tender dossiers were developed. EIA processes were also conducted in compliance with both EU and Turkish legislation, including nature conservation directives. Study visits were also carried out during the project process to observe best practices on-site and facilitate the sharing of experience. |
IPA I/Projects/Technical Assistance Projects