| PROGRAMME | Environment and Climate Action Sector Operational Programme |
| PRIORITY AREA | Water (Infrastructure Activities) |
| BENEFICIARY(IES) | Yüksekova Municipality |
| PLACE | Hakkâri/Yüksekova |
| ABOUT THE PROJECT | Overall Objective of the project is:
To accelerate Türkiye’s accession to the EU by enabling a high level of environmental protection and compliance with the EU Water and Wastewater Directives in the Yüksekova region Specific Objectives of the Project:
|
| PROJECT WEBSITE | http://www.yuksekova-wwtp.com/
https://www.instagram.com/yuksekova.wwtp/ https://tr.linkedin.com/in/y%C3%BCksekova-wwtp-a93060253?trk=public_post-text |
| COMPONENTS AND BUDGETS OF THE PROJECT | |
|
CONTRACT 1 |
|
| NAME OF THE CONTRACT
|
Yüksekova Wastewater Treatment Plant Project Technical Assistance and Consultancy Contract |
| BUDGET OF THE CONTRACT | 2,084,617.00 Euros |
| START DATE | 30/03/2020 |
| END DATE | 08/01/2025 Final Acceptance Date |
| PHYSICAL PROGRESS | 100% |
|
CONTRACT 2 |
|
| NAME OF THE CONTRACT | Yüksekova Wastewater Treatment Plant Construction Works Contract |
| BUDGET OF THE CONTRACT | 7,650,000.00 Euros |
| START DATE | 22/06/2020 |
| END DATE | 31/10/2024 Final Acceptance Date |
| PHYSICAL PROGRESS | 100% |