| PROGRAMME | Environment and Climate Action Sector Operational Programme |
| PRIORITY AREA | Water (Infrastructure Activities) |
| BENEFICIARY(IES) | Şırnak Municipality |
| PLACE | Şırnak |
| ABOUT THE PROJECT | Overall Objective of the project is:
To contribute to a high level of environmental protection and to the alignment of Türkiye with the EU wastewater sector directives, thereby accelerating Türkiye’s accession process Specific Objectives of the Project:
|
| COMPONENTS AND BUDGETS OF THE PROJECT | |
| CONTRACT 1 | |
| NAME OF THE CONTRACT | Şırnak Wastewater Treatment Plant Project Technical Assistance and Consultancy Contract |
| BUDGET OF THE CONTRACT | 1,711,242.00 Euros |
| START DATE | 1/11/2019 |
| END DATE | 15/05/2024 Final Acceptance Date |
| PHYSICAL PROGRESS | 100% |
| CONTRACT 2 | |
| NAME OF THE CONTRACT | Şırnak Wastewater Treatment Plant Project Construction Works Contract |
| BUDGET OF THE CONTRACT | 7,650,577.35 Euros |
| START DATE | 25/11/2019 |
| END DATE | 17/11/2023 Final Acceptance Date |
| PHYSICAL PROGRESS | 100% |