IPA I/Projects/Water Management Projects

Silvan Drinking Water Project

NAME OF THE PROGRAMME Environment Operational Programme (2007–2013)
START DATE 22/01/2015
END DATE 15/12/2018
BENEFICIARY(IES) Diyarbakır Metropolitan Municipality
PLACE Diyarbakır/Silvan
BUDGET OF THE CONTRACT 10,477,409.02 Euros
ABOUT THE PROJECT Within the scope of the project, it is planned to meet the needs of the district of Silvan until the year 2045:

  • 7,313.91 m transmission line
  • 133,082.18 m network line
  • 7,971.39 m household connection
  • Construction of 3 water reservoirs with capacities of 1,000 m³, 2,000 m³ and 4,000 m³
  • Rehabilitation of the existing water reservoir (1,290 m³) and pumping stations
  • Construction of a new pumping station
CONTRACTS WITHIN THE SCOPE OF THE PROJECT
  Technical Assistance and Consultancy Service Contract
  Silvan Drinking Water Supply Project
  Supply (Procurement) Contract Lot-1