| NAME OF THE PROGRAMME | Environment Operational Programme (2007–2013) |
| START DATE | 21/04/2014 |
| END DATE | 07/12/2019 |
| BENEFICIARY(IES) | Van Metropolitan Municipality |
| PLACE | Van/Erciş |
| BUDGET OF THE CONTRACT | 18,962,818.21 Euros |
| ABOUT THE PROJECT | Within the scope of the Project, the works included the construction of approximately 18.6 km transmission pipeline consisting of HDPE and ductile pipes with diameters ranging from 700 mm to 160 mm, the rehabilitation of the Işıklı water source and intake structure, the construction of approximately 209 km distribution network consisting of HDPE pipes with diameters ranging from 630 mm to 90 mm, the design and construction of a drinking water treatment plant with a capacity of 35,860 m³/day, the construction of 2 new pumping stations, a new 300 m³ reservoir, the supply of 7,663 water meters and 5,700 household connections, as well as the installation of flow meters and monitoring systems in the reservoirs. |
| CONTRACTS WITHIN THE SCOPE OF THE PROJECT | |
| Technical Assistance and Consultancy Service Contract | |
| Erciş Drinking Water Supply Construction Project | |
| Supply (Procurement) Contract Lot-1 | |
| Supply (Procurement) Contract Lot-2 | |
IPA I/Projects/Water Management Projects
Erciş Drinking Water Supply Project