Doğubayazıt Drinking Water Supply Project

NAME OF THE PROGRAMME Environment Operational Programme (2007–2013)
START DATE 20/12/2011
END DATE 12/12/2017
BENEFICIARY(IES) Doğubayazıt Municipality
PLACE Ağrı/Doğubayazıt
BUDGET OF THE CONTRACT 28,748,218.66 Euros
ABOUT THE PROJECT Through the Project, it was aimed to provide the district centre with 24-hour uninterrupted safe drinking water supplied from Balık Lake, to collect the generated wastewater and convey it to the wastewater treatment plant planned to be constructed under IPA II funds by means of wastewater collectors, thereby contributing to the creation of a healthier environment in the region.

Within the scope of the project;

  • Construction of a drinking water treatment plant with a capacity of 34,500 m³/day and serving a population of 98,000
  • 57 km ductile main transmission pipeline and associated structures
  • 6 water reservoirs with a total capacity of 15,200 m³
  • 202 km urban drinking water distribution network
  • 12,000 household connections and water meters
  • one drinking water pumping station

was carried out.

CONTRACTS WITHIN THE SCOPE OF THE PROJECT
  Technical Assistance and Consultancy Contract
  Drinking Water Supply Construction Works Contract
  Wastewater Collectors and Network Construction