NAME OF THE PROGRAMME Environment Operational Programme (2007–2013)
START DATE 25/12/2011
END DATE 26/11/2018
BENEFICIARY(IES) Diyarbakır Metropolitan Municipality
PLACE Diyarbakır
BUDGET OF THE CONTRACT 62,633,546.87 Euros
ABOUT THE PROJECT Within the scope of the Project, a wastewater treatment plant with an average flow of 175,000 m³/day and a capacity of 861,837 population equivalent was designed and constructed by the Contractor, and training on operation and maintenance was provided to the staff of DİSKİ.

Within the scope of the Project, by rehabilitating the existing plant that carried out physical treatment, it was transformed into a facility capable of advanced biological treatment. In the facility capable of removing carbon, nitrogen and phosphorus, the stabilization of the sludge is carried out in anaerobic sludge digesters. By using the biogas generated in anaerobic sludge digesters, a certain portion of the facility’s energy demand is met.

CONTRACTS WITHIN THE SCOPE OF THE PROJECT
  Technical Assistance and Consultancy Service Contract
  Diyarbakır Wastewater Treatment Plant Construction
  Diyarbakır Wastewater Pipeline Rehabilitation and Stormwater Drainage System Construction Works
  Supply (Procurement) Contract Lot-1