Şanlıurfa Wastewater Treatment Plant and Collector Lines Project

NAME OF THE PROGRAMME Environment Operational Programme (2007–2013)
START DATE 28/12/2015
END DATE 15/11/2019
BENEFICIARY(IES) Şanlıurfa Metropolitan Municipality
PLACE Şanlıurfa
BUDGET OF THE CONTRACT 29,695,813.79 Euros
ABOUT THE PROJECT A wastewater treatment plant with an average flow of 145,000 m³/day and a capacity equivalent to 721,000 population, designed to serve 636,000 people until the year 2030, has been constructed within the scope of the project.

It includes the renewal of the existing Kara Köprü wastewater main collector and the construction of an additional line (12 km), the construction of the Yenice – Agricultural City collector (2.6 km) and the construction of the foothill collector (7 km).

CONTRACTS WITHIN THE SCOPE OF THE PROJECT
  Technical Assistance and Consultancy Service Contract
  Şanlıurfa Wastewater Treatment Plant Construction
  Şanlıurfa Wastewater Collector Lines Renewal Works
  Supply (Procurement) Contract Lot-1
  Supply (Procurement) Contract Lot-2
  Supply (Procurement) Contract Lot-4