| NAME OF THE PROGRAMME | Environment Operational Programme (2007–2013) |
| START DATE | 26/10/2015 |
| END DATE | 09/12/2018 |
| BENEFICIARY(IES) | Manisa Metropolitan Municipality |
| PLACE | Manisa/Soma |
| BUDGET OF THE CONTRACT | 6,330,417.36 Euros |
| ABOUT THE PROJECT | Within the scope of the project, the first stage construction of the Soma wastewater treatment plant with a capacity of 13,764 m³/day, and the completion of the main collector line of 850 m in length with a diameter of 1,200 mm, have been carried out. The wastewater collector of Turgutalp Town has been connected to the main wastewater collector by means of a 50 m long concrete pipe with a diameter of 300 mm. The treated water collector has been connected to the Bakırçay Stream by means of a 152 m long concrete pipe with a diameter of 1,000 mm. |
| CONTRACTS WITHIN THE SCOPE OF THE PROJECT | |
| Technical Assistance and Consultancy Service Contract | |
| Soma Wastewater Treatment Plant Construction | |
| Equipment Supply Contract (Lot-1) | |
| Equipment Supply Contract (Lot-2) | |
IPA I/Projects/Water Management Projects
Soma Wastewater Project