IPA I/Projects/Water Management Projects

Bulancak Water and Wastewater Project

NAME OF THE PROGRAMME Environment Operational Programme (2007–2013)
START DATE 06/2013
END DATE 28/12/2018
BENEFICIARY(IES) Giresun-Bulancak Municipality
PLACE Giresun/Bulancak
BUDGET OF THE CONTRACT 18,588,015.50 Euros
ABOUT THE PROJECT Within the scope of the Technical Assistance Project, the administrative, technical and financial capacity of the Project Implementation Unit/Water and Sewerage Administration was strengthened, the design report, drawings and tender documents of the Wastewater Treatment Plant were prepared, and the supervision of the construction works for the drinking water supply and the wastewater treatment plant was carried out.

Within the scope of the Project, 97 km of network renewal, 20.4 km of transmission pipeline, the construction of 6 water reservoirs, 4 drinking water pumping stations, the rehabilitation of 3 wells and the drilling of 4 new wells were carried out.

Within the scope of the Project, the construction of a wastewater treatment plant with a capacity of approximately 12,000 m³/day, 6 km of collector pipeline, 8.5 km of wastewater network and 3 pumping stations was carried out.

CONTRACTS WITHIN THE SCOPE OF THE PROJECT
  Technical Assistance and Consultancy Contract
  Bulancak Drinking Water Network Construction Works
  Bulancak Wastewater Treatment Plant and Wastewater Network Construction Works
  Supply (Procurement) Contract Lot-2
  Supply (Procurement) Contract Lot-3