| NAME OF THE PROGRAMME | Environment Operational Programme (2007–2013) |
| START DATE | 29/12/2015 |
| END DATE | 01/04/2019 |
| BENEFICIARY(IES) | Konya Metropolitan Municipality |
| PLACE | Konya/ Akşehir |
| BUDGET OF THE CONTRACT | 12,458,840.90 Euros |
| ABOUT THE PROJECT | Within the scope of the Contract, the activities carried out included the supervision of the first component, namely the Akşehir Wastewater Treatment Plant and Wastewater Collectors Construction Works; the strengthening of KOSKİ’s technical capacity; and the preparation of tender documents for Equipment Supply.
The Project consists of two parts: the first part is the construction of one wastewater treatment plant with a capacity of 15,102 m³/day (first stage – 2025); the second part is the construction of approximately 33 km of wastewater collectors. The wastewater treatment plant has the capacity to serve an equivalent population of 63,000. The final acceptance of the plant was carried out on 09 December 2018 |
| CONTRACTS WITHIN THE SCOPE OF THE PROJECT | |
| Technical Assistance and Consultancy Service Contract | |
| Akşehir Wastewater Treatment Plant and Wastewater Collectors Construction Works | |
| Supply (Procurement) Contract Lot-1 | |
| Supply (Procurement) Contract Lot-3 | |
| Supply (Procurement) Contract Lot-4 | |
IPA I/Projects/Water Management Projects
Akşehir Wastewater Project