IPA II/Projects/Water Management Projects

Iğdır Wastewater Project

PROGRAMME Environment and Climate Action Sector Operational Programme
PRIORITY AREA Water (Infrastructure Activities)
BENEFICIARY(IES) Iğdır Municipality
PLACE Iğdır
ABOUT THE PROJECT Overall Objective of the project is:

To support the accession process by ensuring Türkiye’s compliance with environmental protection and EU wastewater sector directives

Specific Objectives of the Project:

  • Construction of a wastewater treatment facility with a daily capacity of 21,000 cubic metres and a 90‑kilometre collector line
  • Improving the water quality of Aras River via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health
  • Improving the wastewater collection system to overcome the operational problems in the sewerage system
PROJECT WEBSITE http://www.igdiratiksuprojesi.com
COMPONENTS AND BUDGETS OF THE PROJECT

CONTRACT 1

NAME OF THE CONTRACT Iğdır Wastewater Project Technical Assistance and Consultancy Contract
BUDGET OF THE CONTRACT 1,728,250.00 Euros
START DATE 21/07/2020
END DATE Ongoing

CONTRACT 2

NAME OF THE CONTRACT Iğdır Wastewater Treatment Plant Construction Works Contract (Lot-1)
BUDGET OF THE CONTRACT 10,685,850.00 Euros
START DATE 21/07/2020
END DATE 21/07/2022 Provisional Acceptance Date

11/07/2024 Final Acceptance Date

PHYSICAL PROGRESS 100%

CONTRACT 3

NAME OF THE CONTRACT Iğdır Wastewater Collection Project Construction Works Contract (Lot-2)
BUDGET OF THE CONTRACT 6,619,000.00 Euros
START DATE 21/07/2020
END DATE 21/07/2022 Provisional Acceptance Date
PHYSICAL PROGRESS 100%

LOCATION: